Posted on: September 12, 2020 Posted by: admin Comments: 0

Click here to purchase
Specifies methods for any size and type of impulse or reaction turbine, storage pump or pump turbine. Determines whether the contract guarantees have been fulfilled and deals with the rules governing these tests as well as the methods of computing the results and the content and style of the final report. Replaces IEC 60198 (1966) and IEC 60607 (1978).

Product Details

Edition:
3.0
Published:
11/30/1991
Number of Pages:
419
File Size:
1 file , 17 MB