Click here to purchase
This Practice provides requirements for quality control and quality assurance for the installation of monolithic refractory lining materials.
This Practice covers the general requirements for testing and inspecting of monolithic refractory linings. Test and inspection methods include installer prequalification, production sample testing, in-progress installation inspection, and final inspection of the completed lining.
Product Details
- Published:
- 01/01/2013
- Number of Pages:
- 17
- File Size:
- 1 file , 130 KB