1.1 Purpose

This Practice provides the minimum requirements for field inspection and testing of new, installed electrical equipment and facilities.

1.2 Scope

This Practice describes the inspection and testing procedures for new electrical equipment and systems after installation. This Practice provides minimum acceptable values for the testing results and forms for recording inspection and test values.

Certain specialty equipment and packaged equipment are application specific and are not covered by this Practice.

Some inspections and tests may require an independent testing organization or an equipment manufacturer’s representative. This Practice does not specify which tests require a third party or designate responsibility for obtaining and coordinating these third parties. These tests, if required, shall be defined in the project scope.

This Practice does not cover full compliance inspections required by various codes and regulations but does provide assurance of equipment integrity and compliance with project-specific documents.

Product Details

Published:
02/01/2010
Number of Pages:
55
File Size:
1 file , 1.1 MB
Posted on: September 12, 2020 Posted by: admin Comments: 0

Click here to purchase
This Practice describes the minimum requirements for inspection, testing, and commissioning procedures for electrical equipment and systems after installation. This Practice provides minimum acceptable values for the testing results and forms for recording inspection and test values. Certain specialty equipment and packaged equipment are application specific and the testing of such equipment is not covered by this Practice. Some inspections, tests, and commissioning may require an independent testing organization or an equipment manufacturer?s representative. This Practice does not specify which activities require a third party or designate responsibility for obtaining and coordinating these third parties. These activities, if required, shall be defined in the project scope. This Practice does not cover full compliance inspections required by various codes and regulations but does provide assurance of equipment integrity and compliance with project-specific documents.

Product Details

Published:
11/01/2017
Number of Pages:
96
File Size:
1 file , 1.9 MB
Posted on: September 12, 2020 Posted by: admin Comments: 0

Click here to purchase
1.1 Purpose

This Practice provides the minimum requirements for field inspection and testing of new, installed electrical equipment and facilities.

1.2 Scope

This Practice describes the inspection and testing procedures for new electrical equipment and systems after installation. This Practice provides minimum acceptable values for the testing results and forms for recording inspection and test values.

Certain specialty equipment and packaged equipment are application specific and are not covered by this Practice.

Some inspections and tests may require an independent testing organization or an equipment manufacturer’s representative. This Practice does not specify which tests require a third party or designate responsibility for obtaining and coordinating these third parties. These tests, if required, shall be defined in the project scope.

This Practice does not cover full compliance inspections required by various codes and regulations but does provide assurance of equipment integrity and compliance with project-specific documents.

Product Details

Published:
03/01/2001
File Size:
1 file , 84 KB