Posted on: March 21, 2023 Posted by: admin Comments: 0

Click here to purchase

The purpose of this document is to provide recommended practices for an owner/operator to develop and implement a material verification program (MVP) as part of an asset integrity program. The MVP uses positive material identification (PMI) and other testing and administrative methods to verify that the nominal composition of an asset, an asset component, or weldment (or any other tested item) is consistent with the selected or specified construction materials.

A well-designed and well-implemented MVP is an important management system used to minimize the potential for release of hazardous substances due to nonconforming materials of construction.

Product Details

Edition:
4th
Published:
02/01/2023
Number of Pages:
28
File Size:
1 file , 680 KB
Product Code(s):
C57804, C57804
Note:
This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Posted on: September 12, 2020 Posted by: admin Comments: 0

Click here to purchase
The purpose of this recommended practice (RP) is to provide the guidelines for the owner/user to develop and implement a material verification program (MVP) as part of an asset integrity program. The MVP uses positive material identification and other methods to verify that the nominal composition of an asset, an asset component, or weldment within the pressure envelope is consistent with the selected or specified construction materials.

A well-designed and implemented MVP is an important management system used to minimize the potential for the release of hazardous substances due to nonconforming materials of construction.

This RP provides the guidelines for material verification programs involving ferrous and nonferrous alloys during the construction, installation, maintenance, and inspection of new and existing process equipment. This RP applies to metallic materials purchased for use either directly by the owner/user or indirectly through distributors, fabricators, or contractors, and includes the supply, fabrication, and installation of these materials.

This RP applies to all refining and petrochemical industries, and may be applied in other industries and/or businesses at the discretion of the owner/user. It is intended to be applied by any owner/user wishing to verify and/or validate that the materials of construction received, fabricated, and/or installed are in accordance with material and/or company specification(s).

Product Details

Edition:
3rd
Published:
02/01/2018
Number of Pages:
28
File Size:
1 file , 310 KB
Redline File Size:
2 files , 3.5 MB
Product Code(s):
C57803, C57803, C57803, C57803, C57803, C57803
Note:
This product is unavailable in Cuba, Iran, North Korea, Syria