Posted on: September 12, 2020 Posted by: admin Comments: 0

Click here to purchase
This document assists gas-lift system operators, analysts, technicians, engineers, and others in understanding how to effectively plan, operate, maintain, troubleshoot and provide surveillance for gas-lift systems and gas-lift wells.

These recommended practices discuss continuous gas-lift with injection in the casing/tubing annulus and production up the tubing. Annular flow gas-lift (injection down the tubing and production up the annulus), dual gas-lift (two tubing strings in the same casing), and intermittent gas-lift are mentioned; however, most of the discussion focuses on conventional continuous gas-lift.

Product Details

Edition:
1st
Published:
07/01/2019
Number of Pages:
99
File Size:
1 file , 1.4 MB
Product Code(s):
G19G51, G19G51, G19G51
Note:
This product is unavailable in Cuba, Iran, North Korea, Syria