Click here to purchase
This document assists gas-lift system operators, analysts, technicians, engineers, and others in understanding how to effectively plan, operate, maintain, troubleshoot and provide surveillance for gas-lift systems and gas-lift wells.
These recommended practices discuss continuous gas-lift with injection in the casing/tubing annulus and production up the tubing. Annular flow gas-lift (injection down the tubing and production up the annulus), dual gas-lift (two tubing strings in the same casing), and intermittent gas-lift are mentioned; however, most of the discussion focuses on conventional continuous gas-lift.
Product Details
- Edition:
- 1st
- Published:
- 07/01/2019
- Number of Pages:
- 99
- File Size:
- 1 file , 1.4 MB
- Product Code(s):
- G19G51, G19G51, G19G51
- Note:
- This product is unavailable in Cuba, Iran, North Korea, Syria